Contents Index Topic Contents | ||
Previous Topic: PBM_SETSTEP Next Topic: Progress Bar Control Structures |
PBM_STEPIT
PBM_STEPIT wParam = 0; lParam = 0;Advances the current position for a progress bar by the step increment and redraws the bar to reflect the new position. An application sets the step increment by sending the PBM_SETSTEP message.
- Returns the previous position.
When the position exceeds the maximum range value, this message resets the current position so that the progress indicator starts over again from the beginning.
Top of Page
© 1997 Microsoft Corporation. All rights reserved. Terms of Use.