PRJ4: Field Names for Other Languages for Use in Macros/Views

Last reviewed: November 24, 1997
Article ID: Q131797
The information in this article applies to:
  • Microsoft Project for Windows, version 4.0
  • Microsoft Project for the Macintosh, version 4.0

SUMMARY

Microsoft Project is available in several languages. When you write a macro or create a view that will be used in more than one of these versions of Microsoft Project, you may want a list of field names for these different languages. This article provides the task and resource field name translations from English to Danish, French, German, Italian, and Spanish, and Swedish.

MORE INFORMATION

Danish

               Task Field Names

English                     Danish
% Complete                  % færdigt
% Work Complete             % arbejde færdigt
Actual Cost                 Faktisk omkostning
Actual Duration             Faktisk varighed
Actual Finish               Faktisk slut
Actual Start                Faktisk start
Actual Work                 Faktisk arbejde
Baseline Cost               Oprindelig omkostning
Baseline Duration           Oprindelig varighed
Baseline Finish             Oprindelig slut
Baseline Start              Oprindelig start
Baseline Work               Oprindeligt arbejde
BCWP                        BCWP
BCWS                        BCWS
Confirmed                   Bekræftet
Constraint Date             Betingelsesdato
Constraint Type             Betingelsestype
Contact                     Kontaktperson
Cost                        Omkostning
Cost1                       Omkostning1
Cost2                       Omkostning2
Cost3                       Omkostning3
Cost Variance               Omkostningsafvigelse
Created                     Oprettet
Critical                    Kritisk
CV                          CV
Delay                       Forskydning
Duration                    Varighed
Duration1                   Varighed1
Duration2                   Varighed2
Duration3                   Varighed3
Duration Variance           Varighedsafvigelse
Early Finish                Tidligt sluttidspunkt
Early Start                 Tidligt starttidspunkt
Finish                      Slut
Finish1                     Slut1
Finish2                     Slut2
Finish3                     Slut3
Finish4                     Slut4
Finish5                     Slut5
Finish Variance             Slutafvigelse
Fixed                       Fast
Fixed Cost                  Fast omkostning
Flag1                       Flag1
Flag2                       Flag2
Flag3                       Flag3
Flag4                       Flag4
Flag5                       Flag5
Flag6                       Flag6
Flag7                       Flag7
Flag8                       Flag8
Flag9                       Flag9
Flag10                      Flag10
Free Slack                  Tilladt slæk
Hide Bar                    Skjul søjle
ID                          ID
Late Finish                 Sen afslutning
Late Start                  Sen start
Linked Fields               Forbundne felter
Marked                      Markeret
Milestone                   Milepæl
Name                        Navn
Notes                       Bemærkninger
Number1                     Nummer1
Number2                     Nummer2
Number3                     Nummer3
Number4                     Nummer4
Number5                     Nummer5
Objects                     Objekter
Outline Level               Dispositionsniveau
Outline Number              Dispositionsnummer
Predecessors                Foregående opgaver
Priority                    Prioritet
Project                     Projekt
Remaining Cost              Resterende omkostning
Remaining Duration          Resterende varighed
Remaining Work              Resterende arbejde
Resource Group              Ressourcegruppe
Resource Initials           Initialer
Resource Names              Ressourcenavn
Resume                      Fortsæt
Resume No Earlier Than      Fortsæt tidligst
Rollup                      Opløft
Start                       Start
Start1                      Start1
Start2                      Start2
Start3                      Start3
Start4                      Start4
Start5                      Start5
Start Variance              Startafvigelse
Stop                        Stop
Subproject File             Underprojektfil
Successors                  Efterfølgende opgaver
Summary                     Sumopgave
SV                          SV
Text1                       Tekst1
Text2                       Tekst2
Text3                       Tekst3
Text4                       Tekst4
Text5                       Tekst5
Text6                       Tekst6
Text7                       Tekst7
Text8                       Tekst8
Text9                       Tekst9
Text10                      Tekst10
Total Slack                 Samlet slæk
Unique ID                   Entydigt ID
Unique ID Predecessors      Entydigt ID for foregående opgaver
Unique ID Successors        Entydigt ID for efterfølgende opgaver
Update Needed               Opdatering nødvendig
WBS                         WBS
Work                        Arbejde
Work Variance               Arbejdsafvigelse

             Resource Field Names

English                     Danish
% Work Complete             % arbejde færdigt
Accrue At                   Påføres
Actual Cost                 Faktisk omkostning
Actual Work                 Faktisk arbejde
Base Calendar               Basiskalender
Baseline Cost               Oprindelig omkostning
Baseline Work               Oprindeligt arbejde
Code                        Kode
Cost                        Omkostning
Cost Per Use                Omkostning pr. gang
Cost Variance               Omkostningsafvigelse
Email Address               Elektronisk postadresse
Group                       Gruppe
ID                          ID
Initials                    Initialer
Linked Fields               Forbundne felter
Max Units                   Max enheder
Name                        Navn
Notes                       Bemærkninger
Objects                     Objekter
Overallocated               Overallokeret
Overtime Rate               Overtid
Overtime Work               Overarbejde
Peak                        Toppunkt
Remaining Cost              Resterende omkostning
Remaining Work              Resterende arbejde
Standard Rate               Standard
Text1                       Tekst1
Text2                       Tekst2
Text3                       Tekst3
Text4                       Tekst4
Text5                       Tekst5
Unique ID                   Entydigt ID
Work                        Arbejde
Work Variance               Arbejdsafvigelse

French

               Task Field Names

English                     French
% Complete                  % achev
% Work Complete             % Travail achev
Actual Cost                 Coût réel
Actual Duration             Durée réelle
Actual Finish               Fin réelle
Actual Start                Début réel
Actual Work                 Travail réel
Baseline Cost               Coût planifi
Baseline Duration           Durée planifiée
Baseline Finish             Fin planifiée
Baseline Start              Début planifi
Baseline Work               Travail planifi
BCWP                        CBTE
BCWS                        CBTP
Confirmed                   Confirm
Constraint Date             Date contrainte
Constraint Type             Type de contrainte
Contact                     Contact
Cost                        Coût
Cost1                       Coût1
Cost2                       Coût2
Cost3                       Coût3
Cost Variance               Variation de coût
Created                     Créée
Critical                    Critique
CV                          VC
Delay                       Retard
Duration                    Durée
Duration1                   Durée1
Duration2                   Durée2
Duration3                   Durée3
Duration Variance           Variation de durée
Early Finish                Fin avancée au plus tôt le
Early Start                 Début avancé au plus tôt le
Finish                      Fin
Finish1                     Fin1
Finish2                     Fin2
Finish3                     Fin3
Finish4                     Fin4
Finish5                     Fin5
Finish Variance             Variation date de fin
Fixed                       Figée
Fixed Cost                  Coût fixe
Flag1                       Indicateur1
Flag2                       Indicateur2
Flag3                       Indicateur3
Flag4                       Indicateur4
Flag5                       Indicateur5
Flag6                       Indicateur6
Flag7                       Indicateur7
Flag8                       Indicateur8
Flag9                       Indicateur9
Flag10                      Indicateur10
Free Slack                  Marge libre
Hide Bar                    Masquer la barre
ID                          N
Late Finish                 Fin repoussée au plus tard le
Late Start                  Début repoussé au plus tard le
Linked Fields               Champs liés
Marked                      Marquée
Milestone                   Jalon
Name                        Nom
Notes                       Remarques
Number1                     Numéro1
Number2                     Numéro2
Number3                     Numéro3
Number4                     Numéro4
Number5                     Numéro5
Objects                     Objets
Outline Level               Niveau hiérarchique
Outline Number              Nº hiérarchique
Predecessors                Prédécesseurs
Priority                    Priorit
Project                     Projet
Remaining Cost              Coût restant
Remaining Duration          Durée restante
Remaining Work              Travail restant
Resource Group              Groupe de ressources
Resource Initials           Initiales de la ressource
Resource Names              Noms ressources
Resume                      Reprendre
Resume No Earlier Than      Reprendre au plus tôt le
Rollup                      Report
Start                       Début
Start1                      Début1
Start2                      Début2
Start3                      Début3
Start4                      Début4
Start5                      Début5
Start Variance              Variation date de début
Stop                        Stop
Subproject File             Fichier projet externe
Successors                  Successeurs
Summary                     Récapitulative
SV                          VS
Text1                       Rem1
Text2                       Rem2
Text3                       Rem3
Text4                       Rem4
Text5                       Rem5
Text6                       Rem6
Text7                       Rem7
Text8                       Rem8
Text9                       Rem9
Text10                      Rem10
Total Slack                 Marge totale
Unique ID                   Nº propre
Unique ID Predecessors      Nº propre prédécesseurs
Unique ID Successors        Nº propre successeurs
Update Needed               Mise à jour nécessaire
WBS                         Index WBS
Work                        Travail
Work Variance               Variation de travail

               Resource Field Names

English                     French
% Work Complete             % Travail achev
Accrue At                   Affectation
Actual Cost                 Coût réel
Actual Work                 Travail réel
Base Calendar               Calendrier de base
Baseline Cost               Coût planifi
Baseline Work               Travail planifi
Code                        Code
Cost                        Coût
Cost Per Use                Coût par utilisation
Cost Variance               Variation de coût
Email Address               Adresse messagerie
Group                       Groupe
ID                          N
Initials                    Initiales
Linked Fields               Champs liés
Max Units                   Capacité max
Name                        Nom
Notes                       Remarques
Objects                     Objets
Overallocated               En sur-utilisation
Overtime Rate               Taux heures sup.
Overtime Work               Heures sup.
Peak                        Pointe
Remaining Cost              Coût restant
Remaining Work              Travail restant
Standard Rate               Taux standard
Text1                       Rem1
Text2                       Rem2
Text3                       Rem3
Text4                       Rem4
Text5                       Rem5
Unique ID                   Nº propre
Work                        Travail
Work Variance               Variation de travail

German

             Task Field Names

English                  German
% Complete               % Abgeschlossen
% Work Complete          % Arbeit abgeschlossen
Actual Cost              Aktuelle Kosten
Actual Duration          Aktuelle Dauer
Actual Finish            Aktuelles Ende
Actual Start             Aktueller Anfang
Actual Work              Aktuelle Arbeit
Baseline Cost            Geplante Kosten
Baseline Duration        Geplante Dauer
Baseline Finish          Geplantes Ende
Baseline Start           Geplanter Anfang
Baseline Work            Geplante Arbeit
BCWP                     SKAA
BCWS                     SKBA
Confirmed                Bestätigt
Constraint Date          Einschränkungstermin
Constraint Type          Einschränkungsart
Contact                  Kontaktperson
Cost                     Kosten
Cost1                    Kosten1
Cost2                    Kosten2
Cost3                    Kosten3
Cost Variance            Abweichung Kosten
Created                  Erzeugt
Critical                 Kritisch
CV                       KA
Delay                    Verzögerung
Duration                 Dauer
Duration1                Dauer1
Duration2                Dauer2
Duration3                Dauer3
Duration Variance        Abweichung Dauer
Early Finish             Frühestes Ende
Early Start              Frühester Anfang
Finish                   Ende
Finish1                  Ende1
Finish2                  Ende2
Finish3                  Ende3
Finish4                  Ende4
Finish5                  Ende5
Finish Variance          Abweichung Ende
Fixed                    Fest
Fixed Cost               Feste Kosten
Flag1                    Attribut1
Flag2                    Attribut2
Flag3                    Attribut3
Flag4                    Attribut4
Flag5                    Attribut5
Flag6                    Attribut6
Flag7                    Attribut7
Flag8                    Attribut8
Flag9                    Attribut9
Flag10                   Attribut10
Free Slack               Freie Pufferzeit
Hide Bar                 Balken ausblenden
ID                       Nr.
Late Finish              Spätestes Ende
Late Start               Spätester Anfang
Linked Fields            Verknüpfte Felder
Marked                   Markiert
Milestone                Meilenstein
Name                     Name
Notes                    Notizen
Number1                  Zahl1
Number2                  Zahl2
Number3                  Zahl3
Number4                  Zahl4
Number5                  Zahl5
Objects                  Objekte
Outline Level            Gliederungsebene
Outline Number           Gliederungsnummer
Predecessors             Vorgänger
Priority                 Priorität
Project                  Projekt
Remaining Cost           Verbleibende Kosten
Remaining Duration       Verbleibende Dauer
Remaining Work           Verbleibende Arbeit
Resource Group           Ressourcengruppe
Resource Initials        Ressourcenkürzel
Resource Names           Ressourcennamen
Resume                   Wiederaufnahme
Resume No Earlier Than   Wiederaufnahme nicht früher als
Rollup                   Rollup
Start                    Anfang
Start1                   Anfang1
Start2                   Anfang2
Start3                   Anfang3
Start4                   Anfang4
Start5                   Anfang5
Start Variance           Abweichung Anfang
Stop                     Unterbrechungstermin
Subproject File          Teilprojektdatei
Successors               Nachfolger
Summary                  Sammelvorgang
SV                       PA
Text1                    Text1
Text2                    Text2
Text3                    Text3
Text4                    Text4
Text5                    Text5
Text6                    Text6
Text7                    Text7
Text8                    Text8
Text9                    Text9
Text10                   Text10
Total Slack              Gesamte Pufferzeit
Unique ID                Einmalige Nr.
Unique ID Predecessors   Einmalige Nr. für Vorgänger
Unique ID Successors     Einmalige Nr. für Nachfolger
Update Needed            Aktualisierung erforderlich
WBS                      PSP-Code
Work                     Arbeit
Work Variance            Abweichung Arbeit

            Resource Field Names

English                  German

% Work Complete          % Arbeit abgeschlossen
Accrue At                Fällig am
Actual Cost              Aktuelle Kosten
Actual Work              Aktuelle Arbeit
Base Calendar            Basiskalender
Baseline Cost            Geplante Kosten
Baseline Work            Geplante Arbeit
Code                     Code
Cost                     Kosten
Cost Per Use             Kosten pro Einsatz
Cost Variance            Abweichung Kosten
Email Address            E-Mail-Adresse
Group                    Gruppe
ID                       Nr.
Initials                 Kürzel
Linked Fields            Verknüpfte Felder
Max Units                Max. Einheiten
Name                     Name
Notes                    Notizen
Objects                  Objekte
Overallocated            Überlastet
Overtime Rate            Überstundensatz
Overtime Work            Überstundenarbeit
Peak                     Höchstwert
Remaining Cost           Verbleibende Kosten
Remaining Work           Verbleibende Arbeit
Standard Rate            Standardsatz
Text1                    Text1
Text2                    Text2
Text3                    Text3
Text4                    Text4
Text5                    Text5
Unique ID                Einmalige Nr.
Work                     Arbeit
Work Variance            Abweichung Arbeit

Italian

             Task Field Names

English               Italian
% Complete             % completamento
% Work Complete        % compl. lavoro
Actual Cost            Costo effettivo
Actual Duration        Durata effettiva
Actual Finish          Fine effettiva
Actual Start           Inizio effettivo
Actual Work            Lavoro effettivo
Baseline Cost          Costo previsto
Baseline Duration      Durata prevista
Baseline Finish        Fine prevista
Baseline Start         Inizio previsto
Baseline Work          Lavoro previsto
BCWP                   BCWP
BCWS                   BCWS
Confirmed              Confermata
Constraint Date        Data vincolo
Constraint Type        Tipo vincolo
Contact                Contatto
Cost                   Costo
Cost1                  Costo1
Cost2                  Costo2
Cost3                  Costo3
Cost Variance          Variazione costi
Created                Creata
Critical               Critica
CV                     CV
Delay                  Ritardo
Duration               Durata
Duration1              Durata1
Duration2              Durata2
Duration3              Durata3
Duration Variance      Variazione durata
Early Finish           Prima fine
Early Start            Primo inizio
Finish                 Fine
Finish1                Fine1
Finish2                Fine2
Finish3                Fine3
Finish4                Fine4
Finish5                Fine5
Finish Variance        Variazione fine
Fixed                  Fissa
Fixed Cost             Costo fisso
Flag1                  Proprietà1
Flag2                  Proprietà2
Flag3                  Proprietà3
Flag4                  Proprietà4
Flag5                  Proprietà5
Flag6                  Proprietà6
Flag7                  Proprietà7
Flag8                  Proprietà8
Flag9                  Proprietà9
Flag10                 Proprietà10
Free Slack             Margine di flessibilità libero
Hide Bar               Nascondi barra
ID                     ID
Late Finish            Fine ultima
Late Start             Inizio ultimo
Linked Fields          Campi collegati
Marked                 Contrassegnata
Milestone              Cardine
Name                   Nome
Notes                  Note
Number1                Numero1
Number2                Numero2
Number3                Numero3
Number4                Numero4
Number5                Numero5
Objects                Oggetti
Outline Level          Livello struttura
Outline Number         Numeri di struttura
Predecessors           Predecessori
Priority               Priorit
Project                Progetto
Remaining Cost         Costo rimanente
Remaining Duration     Durata rimanente
Remaining Work         Lavoro rimanente
Resource Group         Gruppo risorse
Resource Initials      Iniziali risorsa
Resource Names         Nomi risorse
Resume                 Riprendi
Resume No Earlier Than Riprendi non prima del
Rollup                 Riporta
Start                  Inizio
Start1                 Inizio1
Start2                 Inizio2
Start3                 Inizio3
Start4                 Inizio4
Start5                 Inizio5
Start Variance         Variazione inizio
Stop                   Stop
Subproject File        File del sottoprogetto
Successors             Successori
Summary                Riepilogo
SV                     SV
Text1                  Testo1
Text2                  Testo2
Text3                  Testo3
Text4                  Testo4
Text5                  Testo5
Text6                  Testo6
Text7                  Testo7
Text8                  Testo8
Text9                  Testo9
Text10                 Testo10
Total Slack            Margine di flessibilità totale
Unique ID              ID unica
Unique ID Predecessors Predecessori di ID unica
Unique ID Successors   Successori di ID unica
Update Needed          Necessario aggiornamento
WBS                    WBS
Work                   Lavoro
Work Variance          Variazione lavoro

           Resource Field Names

English                Italian
% Work Complete        % compl. lavoro
Accrue At              Attribuiti
Actual Cost            Costo effettivo
Actual Work            Lavoro effettivo
Base Calendar          Calendario di base
Baseline Cost          Costo previsto
Baseline Work          Lavoro previsto
Code                   Codice
Cost                   Costo
Cost Per Use           Costo per uso
Cost Variance          Variazione costi
Email Address          Indirizzo posta elettronica
Group                  Gruppo
ID                     ID
Initials               Iniziali
Linked Fields          Campi collegati
Max Units              Unità max
Name                   Nome
Notes                  Note
Objects                Oggetti
Overallocated          Sovrassegnata
Overtime Rate          Tariffa straordinario
Overtime Work          Straordinario
Peak                   Punta
Remaining Cost         Costo rimanente
Remaining Work         Lavoro rimanente
Standard Rate          Tariffa standard
Text1                  Testo1
Text2                  Testo2
Text3                  Testo3
Text4                  Testo4
Text5                  Testo5
Unique ID              ID unica
Work                   Lavoro
Work Variance          Variazione lavoro

Spanish

               Task Field Names

English                     Spanish
% Complete                  % completado
% Work Complete             % trabajo realizado
Actual Cost                 Costo real
Actual Duration             Duración real
Actual Finish               Fin real
Actual Start                Comienzo real
Actual Work                 Trabajo real
Baseline Cost               Costo previsto
Baseline Duration           Duración prevista
Baseline Finish             Fin previsto
Baseline Start              Comienzo previsto
Baseline Work               Trabajo previsto
BCWP                        CPTR
BCWS                        CPTP
Confirmed                   Confirmado
Constraint Date             Fecha de delimitación
Constraint Type             Tipo de delimitación
Contact                     Contacto
Cost                        Costo
Cost1                       Costo1
Cost2                       Costo2
Cost3                       Costo3
Cost Variance               Variación de costo
Created                     Creado
Critical                    Tareas críticas
CV                          VC
Delay                       Retraso
Duration                    Duración
Duration1                   Duración1
Duration2                   Duración2
Duration3                   Duración3
Duration Variance           Variación de duración
Early Finish                Fin anticipado
Early Start                 Comienzo anticipado
Finish                      Fin
Finish1                     Fin1
Finish2                     Fin2
Finish3                     Fin3
Finish4                     Fin4
Finish5                     Fin5
Finish Variance             Variación de fin
Fixed                       Fija
Fixed Cost                  Costo fijo
Flag1                       Indicador1
Flag2                       Indicador2
Flag3                       Indicador3
Flag4                       Indicador4
Flag5                       Indicador5
Flag6                       Indicador6
Flag7                       Indicador7
Flag8                       Indicador8
Flag9                       Indicador9
Flag10                      Indicador10
Free Slack                  Demora permisible
Hide Bar                    Ocultar barra
ID                          Id
Late Finish                 Límite de finalización
Late Start                  Límite de comienzo
Linked Fields               Campos vinculados
Marked                      Marcadas
Milestone                   Hito
Name                        Nombre
Notes                       Notas
Number1                     Número1
Number2                     Número2
Number3                     Número3
Number4                     Número4
Number5                     Número5
Objects                     Objetos
Outline Level               Nivel de esquema
Outline Number              Número en esquema
Predecessors                Predecesoras
Priority                    Prioridad
Project                     Proyecto
Remaining Cost              Costo restante
Remaining Duration          Duración restante
Remaining Work              Trabajo restante
Resource Group              Grupo de recursos
Resource Initials           Iniciales del recurso
Resource Names              Nombres de los recursos
Resume                      Reanudar
Resume No Earlier Than      No reanudar antes de
Rollup                      Informe
Start                       Comienzo
Start1                      Comienzo1
Start2                      Comienzo2
Start3                      Comienzo3
Start4                      Comienzo4
Start5                      Comienzo5
Start Variance              Variación de comienzo
Stop                        Detener
Subproject File             Archivo de subproyecto
Successors                  Sucesoras
Summary                     Resumen
SV                          VP
Text1                       Texto1
Text2                       Texto2
Text3                       Texto3
Text4                       Texto4
Text5                       Texto5
Text6                       Texto6
Text7                       Texto7
Text8                       Texto8
Text9                       Texto9
Text10                      Texto10
Total Slack                 Margen de demora total
Unique ID                   Identificador único
Unique ID Predecessors      Número único para predecesoras
Unique ID Successors        Número único para sucesoras
Update Needed               Actualización necesaria
WBS                         EDT
Work                        Trabajo
Work Variance               Variación de trabajo

             Resource Field Names

English                     Spanish
% Work Complete             % trabajo realizado
Accrue At                   Acumular
Actual Cost                 Costo real
Actual Work                 Trabajo real
Base Calendar               Calendario base
Baseline Cost               Costo previsto
Baseline Work               Trabajo previsto
Code                        Código
Cost                        Costo
Cost Per Use                Costo por uso
Cost Variance               Variación de costo
Email Address               Dirección de correo electrónico
Group                       Grupo
ID                          Id
Initials                    Iniciales
Linked Fields               Campos vinculados
Max Units                   Capacidad máxima
Name                        Nombre
Notes                       Notas
Objects                     Objetos
Overallocated               Sobreasignado
Overtime Rate               Tasa horas extra
Overtime Work               Trabajo de horas extra
Peak                        Máximo
Remaining Cost              Costo restante
Remaining Work              Trabajo restante
Standard Rate               Tasa estándar
Text1                       Texto1
Text2                       Texto2
Text3                       Texto3
Text4                       Texto4
Text5                       Texto5
Unique ID                   Identificador único
Work                        Trabajo
Work Variance               Variación de trabajo

Swedish

                Task Field Names

English                    Swedish
% Complete                  % färdigt
% Work Complete             % färdigt arbete
Actual Cost                 Verklig kostnad
Actual Duration             Verklig varaktighet
Actual Finish               Verkligt slut
Actual Start                Verklig start
Actual Work                 Verkligt arbete
Baseline Cost               Originalkostnad
Baseline Duration           Originalvaraktighet
Baseline Finish             Originalslut
Baseline Start              Originalstart
Baseline Work               Originalarbete
BCWP                        BCWP
BCWS                        BCWS
Confirmed                   Bekräftat
Constraint Date             Villkorsdatum
Constraint Type             Villkorstyp
Contact                     Kontaktperson
Cost                        Kostnad
Cost1                       Kostnad1
Cost2                       Kostnad2
Cost3                       Kostnad3
Cost Variance               Kostnadsavvikelse
Created                     Skapad
Critical                    Kritisk
CV                          CV
Delay                       Förskjutning
Duration                    Varaktighet
Duration1                   Varaktighet1
Duration2                   Varaktighet2
Duration3                   Varaktighet3
Duration Variance           Varaktighetsavvikelse
Early Finish                Tidigt slut
Early Start                 Tidig start
Finish                      Slut
Finish1                     Slut1
Finish2                     Slut2
Finish3                     Slut3
Finish4                     Slut4
Finish5                     Slut5
Finish Variance             Slutavvikelse
Fixed                       Fast
Fixed Cost                  Fast kostnad
Flag1                       Flagga1
Flag2                       Flagga2
Flag3                       Flagga3
Flag4                       Flagga4
Flag5                       Flagga5
Flag6                       Flagga6
Flag7                       Flagga7
Flag8                       Flagga8
Flag9                       Flagga9
Flag10                      Flagga10
Free Slack                  Fritt slack
Hide Bar                    Dölj stapel
ID                          ID
Late Finish                 Sent slut
Late Start                  Sen start
Linked Fields               Länkade fält
Marked                      Märkt
Milestone                   Milstolpe
Name                        Namn
Notes                       Anteckningar
Number1                     Tal1
Number2                     Tal2
Number3                     Tal3
Number4                     Tal4
Number5                     Tal5
Objects                     Objekt
Outline Level               Dispositionsniv
Outline Number              Dispositionsnummer
Predecessors                Föregående aktiviteter
Priority                    Prioritet
Project                     Projekt
Remaining Cost              Återstående kostnad
Remaining Duration          Återstående varaktighet
Remaining Work              Återstående arbete
Resource Group              Resursgrupp
Resource Initials           Resursinitialer
Resource Names              Resurser
Resume                      Fortsätt
Resume No Earlier Than      Fortsätt tidigast
Rollup                      Upplyft
Start                       Start
Start1                      Start1
Start2                      Start2
Start3                      Start3
Start4                      Start4
Start5                      Start5
Start Variance              Startavvikelse
Stop                        Stopp
Subproject File             Underprojektsfil
Successors                  Efterföljande aktiviteter
Summary                     Sammanfattning
SV                          SV
Text1                       Text1
Text2                       Text2
Text3                       Text3
Text4                       Text4
Text5                       Text5
Text6                       Text6
Text7                       Text7
Text8                       Text8
Text9                       Text9
Text10                      Text10
Total Slack                 Totalt slack
Unique ID                   Eget ID
Unique ID Predecessors      Eget ID för föregående aktiviteter
Unique ID Successors        Eget ID för efterföljande aktiviteter
Update Needed               Uppdatering krävs
WBS                         WBS
Work                        Arbete
Work Variance               Arbetsavvikelse

             Resource Field Names

      English                    Swedish
% Work Complete             % färdigt arbete
Accrue At                   Påförs
Actual Cost                 Verklig kostnad
Actual Work                 Verkligt arbete
Base Calendar               Baskalender
Baseline Cost               Originalkostnad
Baseline Work               Originalarbete
Code                        Kod
Cost                        Kostnad
Cost Per Use                Kostnad per tillfälle
Cost Variance               Kostnadsavvikelse
Email Address               e-post
Group                       Grupp
ID                          ID
Initials                    Initialer
Linked Fields               Länkade fält
Max Units                   Max enheter
Name                        Namn
Notes                       Anteckningar
Objects                     Objekt
Overallocated               Överbelagd
Overtime Rate               Övertidskostnad
Overtime Work               Övertidsarbete
Peak                        Topp
Remaining Cost              Återstående kostnad
Remaining Work              Återstående arbete
Standard Rate               Standardkostnad
Text1                       Text1
Text2                       Text2
Text3                       Text3
Text4                       Text4
Text5                       Text5
Unique ID                   Eget ID
Work                        Arbete
Work Variance               Arbetsavvikelse


Additional query words: 4.00 intl convert foreign
Keywords : kbcode kbprg
Version : 4.0
Platform : MACINTOSH WINDOWS
Issue type : kbref


THE INFORMATION PROVIDED IN THE MICROSOFT KNOWLEDGE BASE IS PROVIDED "AS IS" WITHOUT WARRANTY OF ANY KIND. MICROSOFT DISCLAIMS ALL WARRANTIES, EITHER EXPRESS OR IMPLIED, INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. IN NO EVENT SHALL MICROSOFT CORPORATION OR ITS SUPPLIERS BE LIABLE FOR ANY DAMAGES WHATSOEVER INCLUDING DIRECT, INDIRECT, INCIDENTAL, CONSEQUENTIAL, LOSS OF BUSINESS PROFITS OR SPECIAL DAMAGES, EVEN IF MICROSOFT CORPORATION OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. SOME STATES DO NOT ALLOW THE EXCLUSION OR LIMITATION OF LIABILITY FOR CONSEQUENTIAL OR INCIDENTAL DAMAGES SO THE FOREGOING LIMITATION MAY NOT APPLY.