The information in this article applies to:
SYMPTOMSWhen Microsoft SNA Server is configured with one or more channel connections over the Polaris Escon channel adapter, not all of the PUs and LUs reactivate if VTAM is shut down quickly using the VTAM command: z net, cancelIf VTAM is shut down in an orderly manner, the PUs and LUs do reactivate properly. This problem was observed when SNA Server was configured with 15 PUs and 250 LUs each (3750 total LUs). Some LUs failed to reactivate when VTAM was restarted. CAUSEThere are two different problems contributing to the reactivation problems:
WORKAROUNDTo work around this problem, do one of the following:
STATUS
Microsoft has confirmed this to be a problem in the SNA Server version 3.0,
3.0 Service Pack 1 (SP1) and 3.0 SP2.
S E R V P A C K MORE INFORMATION
With this fix applied, SNA Server 3.0 was successfully tested with 15,000
LUs (the maximum LU capacity supported by SNA Server 3.0) over a single
Polaris ESCON adapter (60 PUs, each with 250 LUs).
Q176020 SNA Server Starts Slowly When Configured with 15000 3270 LUs Additional query words: znet barr
Keywords : kbnetwork prodsna kbbug3.00 kbfix3.00.sp3 snachannel snaserverservice |
Last Reviewed: November 30, 1999 © 2000 Microsoft Corporation. All rights reserved. Terms of Use. |