The information in this article applies to:
SUMMARY
When a year marking a new century arrives, one would assume that it is a
leap year because it can be divided by the number 4. This is not always
true for a centesimal year. So, when FoxPro checks to see if a centesimal
year is a leap year, there is another condition that must be met.
MORE INFORMATION
Calendars based on the movements of the sun and moon have been used since
ancient times, but none have been perfect. The Julian calendar, under which
western nations measured time until A.D. 1582 was authorized by Julius
Caesar in 46 B.C., the year 709 of Rome. The Julian calendar, on the
assumption that the true year was 365 1/4 days, gave every fourth year 366
days. The Venerable Bede, an Anglo-Saxon monk, announced in A.D. 730 that
the 365 1/4-day Julian year was 11 minutes, 14 seconds too long, a
cumulative error of about a day every 128 years, but nothing was done about
it for more than 800 years. By 1582, the accumulated error was estimated to
amount to 10 days. In that year Pope Gregory XIII decreed that the day
following Oct. 4, 1582, should be called Oct. 15, thus dropping 10 days and
initiating what became known as the Gregorian calendar.
The first example returns 03/01/1900 to the screen, and the second example
returns 02/29/2000.For more information about how Microsoft products are affected by year 2000 (Y2K) issues, please see the following Microsoft World Wide Web site: http://www.microsoft.com/y2k/ Additional query words:
Keywords : kb2000 kbVFp kbVFp300 kbVFp300b kbVFp500a kbVFp600 FxotherGeneral |
Last Reviewed: June 16, 1999 © 2000 Microsoft Corporation. All rights reserved. Terms of Use. |