ACC: DateAdd() "w" Interval Does Not Work as Expected
ID: Q115489
|
The information in this article applies to:
-
Microsoft Access versions 1.0, 1.1, 2.0, 7.0, 97
SYMPTOMS
Moderate: Requires basic macro, coding, and interoperability skills.
When you use the "w" interval to add days to a date, the DateAdd() function
adds the total number of days that you specified to the date, instead of
adding the appropriate number of workdays to the date as you would expect.
This article assumes that you are familiar with Visual Basic for
Applications and with creating Microsoft Access applications using the
programming tools provided with Microsoft Access. For more information
about Visual Basic for Applications, please refer to the "Building
Applications" manual.
NOTE: Visual Basic for Applications (used in Microsoft Access version 7.0)
is called Access Basic in earlier versions. For more information about
Access Basic, please refer to the "Introduction to Programming" manual in
Microsoft Access version 1.x, or the "Building Applications" manual in
version 2.0.
CAUSE
The intervals in the DateAdd() function are the same as those used in the
DatePart() function. The DatePart() function uses the "w" interval to
return the weekday, or day of the week, from a date. The value returned
from the DatePart() function is an integer from 1 to 7, representing the
days of the week (Sunday through Saturday). When you add days using the "w"
interval, weekdays (which include all the days of the week) are added.
To add workdays (Monday through Friday) to a date, use the sample function
described in the "Resolution" section.
RESOLUTION
You can use the following sample user-defined function to add workdays,
rather than weekdays, to a date.
NOTE: In the following sample code, an underscore (_) at the end of a line
is used as a line-continuation character. Remove the underscore from the
end of the line when re-creating this code in Access Basic.
'**********************************************************
'Declarations section of the module
'**********************************************************
Option Explicit
'==========================================================
' The DateAddW() function provides a workday substitute
' for DateAdd("w", number, date). This function performs
' error checking and ignores fractional Interval values.
'==========================================================
Function DateAddW (ByVal TheDate, ByVal Interval)
Dim Weeks As Long, OddDays As Long, Temp As String
If VarType(TheDate) <> 7 Or VarType(Interval) < 2 Or _
VarType(Interval) > 5 Then
DateAddW = TheDate
ElseIf Interval = 0 Then
DateAddW = TheDate
ElseIf Interval > 0 Then
Interval = Int(Interval)
' Make sure TheDate is a workday (round down).
Temp = Format(TheDate, "ddd")
If Temp = "Sun" Then
TheDate = TheDate - 2
ElseIf Temp = "Sat" Then
TheDate = TheDate - 1
End If
' Calculate Weeks and OddDays.
Weeks = Int(Interval / 5)
OddDays = Interval - (Weeks * 5)
TheDate = TheDate + (Weeks * 7)
' Take OddDays weekend into account.
If (DatePart("w", TheDate) + OddDays) > 6 Then
TheDate = TheDate + OddDays + 2
Else
TheDate = TheDate + OddDays
End If
DateAddW = TheDate
Else ' Interval is < 0
Interval = Int(-Interval) ' Make positive & subtract later.
' Make sure TheDate is a workday (round up).
Temp = Format(TheDate, "ddd")
If Temp = "Sun" Then
TheDate = TheDate + 1
ElseIf Temp = "Sat" Then
TheDate = TheDate + 2
End If
' Calculate Weeks and OddDays.
Weeks = Int(Interval / 5)
OddDays = Interval - (Weeks * 5)
TheDate = TheDate - (Weeks * 7)
' Take OddDays weekend into account.
If (DatePart("w", TheDate) - OddDays) < 2 Then
TheDate = TheDate - OddDays - 2
Else
TheDate = TheDate - OddDays
End If
DateAddW = TheDate
End If
End Function
How to Use the DateAddW() Function
Use the DateAddW() function wherever you would use the DateAdd() function.
For example, instead of
DateAdd("w",[StartDate],10)
use:
DateAddW([StartDate],10)
To test the DateAddW() function, enter the following line in the Debug
window (or Immediate window in versions 1.x and 2.0), and then press ENTER:
? DateAddW(#2/2/93#,10)
Note that the result is 2/16/93 (10 workdays).
STATUS
This behavior is by design.
MORE INFORMATION
Steps to Reproduce Behavior
Enter the following line in the Debug window, (or Immediate window) and
then press ENTER:
? DateAdd("w",#2/2/93#,10)
Note that the result is 2/12/93 (10 days), not 2/16/93 (10 workdays).
REFERENCES
For more information about the DateAdd() function, search for "DateAdd"
using the Microsoft Access 7.0 Help Index.