How to set job step success or failure flow (Enterprise Manager)
To set job step success or failure flow
- In the details pane, right-click the job, and then click Properties.
- In the Job Properties dialog box, click the Steps tab, click a step, and then click Edit.
- In the Edit Job Step dialog box, click the Advanced tab.
- In the On success action list, click the action to perform if the job step completes successfully.
- In the Retry attempts box, enter the number of times from 0 through 9999 that the job step should be repeated before it is considered to have failed. If you entered a value greater than 0 in the Retry attempts box, enter in the Retry interval (minutes) box the number of minutes from 1 through 9999 that must pass before the job step is retried.
- In the On failure action list, click the action to perform if the job step fails.
(c) 1988-98 Microsoft Corporation. All Rights Reserved.