Building a Windows 2000 Test Lab
|
|
Testing Process
Figure 4.2 is a flowchart illustrating the phases for planning and conducting tests in the lab.
The primary activities are:
- Creating a test plan that describes scope, objectives, and methodology.
- Designing test cases that describe how to conduct tests.
- Conducting tests and evaluating results.
- Documenting test results.
- Escalating problems to the proper people for resolution.
Figure 4.2 Process for Planning and Conducting Tests
© 1985-2000 Microsoft Corporation. All rights reserved.