Conducting Your Windows 2000 Pilot |
As the start date for your pilot approaches, begin preparing for the rollout. Allow enough time in advance to prepare both the users and the physical sites. As the users test the Windows 2000 design, the installation team needs to develop, test, document, and refine the rollout procedure.